BART Berryessa Extension

Envirosurvey provided the following services for the BART Berryessa Extension:

  • A comprehensive Phase II environmental site assessment and soil characterization.

  • Collected and analyzed 800+ soil samples. Compiled and executed reports containing soil analysis, boring locations, observations and recommendations.

  • Developed site specific health and safety plans for work areas containing hazardous contamination throughout the site and updated the plans to accelerate work as new data was developed.

  • Conducted the Self Monitoring Program, required by the Regional Water Board for operation of multiple dewatering and groundwater treatment systems.

*The images above were taken by ESI at the BART Berryessa Extension project